SIMCO HOLDINGS LIMITED · HONGKONG. SHANDONG. TIANJIN
WhatsApp

Frequently asked questions, answered clearly.

Send your specification and our team will come back with a written answer.

01What is SIMCO’s manufacturing and supply structure?
SIMCO HOLDINGS LIMITED is an integrated steel supply company, combining international trading with a manufacturing foundation at Shandong Guanzhou Co.Ltd. and a network of qualified partner mills. Our manufacturing base in Shandong supports production coordination and quality follow-up, while partner mills provide additional sourcing options for different products and specifications. International contracts are handled by SIMCO HOLDINGS LIMITED, and our teams coordinate production follow-up, inspection, export documentation and shipment arrangements.
02Which steel coil products does SIMCO focus on?
SIMCO focuses on seven core flat-rolled steel product lines: CRC, GI, GL, ZAM, PPGI, PPGL and PPAZM. We can also review related steel products as separate sourcing requests through our mill network. Availability, producing mill and commercial terms are confirmed before quotation.
03What is your minimum order quantity?
Our usual minimum order quantity is 25 tonnes per size and 100 tonnes per order. Final quantities are confirmed according to the product specifications and producing mill requirements.
04What information should I include in an RFQ?
Please include the product, steel grade, thickness, width, quantity and destination port. For coated coils, specify the coating mass and whether it refers to total both sides or a single side. For prepainted coils, include the paint system, top and back film thickness, and colour reference.
05How quickly can you provide a quotation?
We aim to respond to complete quotation requests within one working day. The response time may depend on the technical details and mill confirmation required.
06What is your typical delivery lead time?
All supplies are made to order. Typical delivery lead time is around 20–40 days, depending on product specifications, mill production schedules and shipping arrangements. The actual schedule is confirmed for each order.
07What payment terms do you accept?
We primarily accept T/T and irrevocable L/C at sight. Payment arrangements are agreed according to the order and contract. For qualified customers with an established trading history, open-account credit terms may be available, upon successful credit review and internal approval.
08Which trade terms can you offer?
We can work with EXW, FCA, FOB, CFR and CIF terms, as agreed for each order.
09How do you handle quality claims?
We take quality accountability seriously and handle claims through a transparent, evidence-based process.
Fact-based review: claims are assessed within the agreed claim period against the sales contract, agreed technical specifications, original Mill Test Certificates (MTCs), coil identification numbers and relevant inspection records.
Factory investigation: reported issues are referred to the producing mill and our technical team for investigation and root-cause analysis, with corrective actions where necessary.
Practical resolution: for verified claims, we agree a fair and practical solution in line with the investigation results and contractual obligations — for example financial compensation, a price adjustment, or another mutually agreed commercial remedy.
Transit damage support: for damage in transit, we help coordinate with the carrier or insurer, subject to the agreed Incoterms and insurance arrangements.
10Can SIMCO source products outside its seven core coil lines?
Yes. Where a buyer needs related steel products to consolidate a shipment, we can review them as a separate sourcing request through our mill network. Availability, producing mill and commercial terms are confirmed before quotation.
11Does SIMCO supply steel coils from stock?
No. Our steel coil supplies are made to order against confirmed specifications and order requirements.
12What is the maximum order size?
SIMCO is structured to support large-volume steel coil requirements through its manufacturing foundation and qualified partner mill network. The feasible order volume and shipment schedule are reviewed according to product specifications, mill capacity and logistics arrangements.